The Process

How It Works

Upgraded Water Treatment Process

  1. At the District’s request, the Corps of Engineers releases water from Lake Grapevine Dam into Denton Creek.
  2. Water from Lake Grapevine flows into Denton Creek and then into the Elm Fork of the Trinity River. From the Trinity River it is captured into Ski Lake near Hwy. 114 and N.W. Highway.
  3. Water flows through a pipeline to the District’s plant on Regal Row where it is screened and then pumped through the plant’s treatment process.
  4. Lime slurry and ferric sulfate are added to the rapid mix. The rapid mixer provides mixing of these chemicals with the raw water, causing coagulation, or clotting of impurities in the water.
  5. The water then goes to the flocculators, where the coagulation continues, creating floc particles that are heavier than water.
  6. From the flocculators, the water enters clarifiers (settling tanks) where the floc settles out of the water. This settle floc or sludge is pumped out to the sludge lagoons for future disposal.
  7. The clarified water then is run through granular activated carbon (GAC) filters to remove remaining floc particles, as well as taste and odor compounds. The filtered water is then disinfected via the addition of chlorine and ammonia, forming chloramine.  Chloramines are used to cut down on the formation of trihalomethanes (THMs) or other disinfection byproducts caused by the addition of chlorine alone.
  8. This filtered water is then pumped to the District’s new ultra membrane filters for final filtration.  These filters will filter out all particles 0.4 microns and larger.  This provides a physical barrier to Cryptosporidium and Giardia cysts that can cause intestinal, digestive upsets.  The filtered water is then sent to the District’s 10 million gallon underground clear well (storage tank), where the water is stored until pumped to the Town of Highland Park and the City of University Park as needed.
  • 1938 – Dallas County Park Cities Water Control and Improvement District No. 2 created by State of Texas at the request of the City of University Park and the Town of Highland Park to obtain a common and independent water supply. District is governed by a five member Board of Directors elected from the Town and the City.
  • 1946 – District obtained water rights for a reservoir on Denton Creek for 50,000 acre feet of water.
  • 1947 – District entered into agreement with U.S. Corps of Engineers for construction of a larger lake – Grapevine Lake – along with the City of Dallas, whose share would be 85,000 acre feet of water. The District’s share of the cost was $607,000.
  • 1950 – District water treatment plant completed and began operation utilizing raw water purchased from City of Dallas until Grapevine Lake could be completed. Cost of treatment facilities, transmission mains, and storage was $4,086,000.
  • 1952 – Grapevine Lake completed.
  • 1954 – District began taking water from Grapevine Lake.
  • 1973 – District converted from a Water Control and Improvement District No. 2 to a Municipal Utility District.
  • 1982 – District entered into a temporary emergency supply agreement with the City of Dallas to supply treated water to the Town and/or the City in cases of emergency.
  • 2004 – District engineering consultant conducted study for upgrading the treatment facilities to latest technology to meet proposed new Federal Regulations. Consultant recommended adding membrane filtration facilities.
  • 2005 – District committed to the Town and the City that it will also address elimination of taste and odor episodes in any new treatment facilities.
  • 2006 – District engineering consultant conducted pilot study on three micro/ultra membrane manufacturers’ filter units.
  • 2007 – Engineering consultant preliminary design study completed and approved by the State on the use of membrane filters to treat the District’s water. Also, recommended three options to address taste and odor issues.
  • 2009 – Design begun on membrane filter facilities and plant improvements. Construction Manager of Risk hired to manage project construction as well as be involved in design process.
  • 2010 – Sold $33 million of revenue bonds and start of construction.
  • 2013 – Project completed and operational.

FAQs

Why don't we just buy Dallas water?

Dallas water quality is excellent, and we use it when we need an emergency supply but our city fathers wanted us to have a separate water supply, independent of Dallas and others.

What do I do if I see a leak?

Contact your city Public Works Department: University Park, 214-363-1644 or Highland Park, 214-521-4161

What do I do if the water smells funny?

Contact us at [email protected] and give us your address and description of the taste/odor problem. We will contact you and set up a visit by our lab technician to come take a sample of your water, test it and determine what the problem is. With the District’s installation of our new granular activated carbon filters, the usual episodes of taste and odor occurrences, usually related to lake turnover, has been mitigated.

What do I do if the sewer backs up?

Contact your city Public Works Department: University Park, 214-363-1644 or Highland Park, 214-521-4161

Where do we get our water?

Our water comes from a surface water source as opposed to wells. It comes from Grapevine Lake via the Elm Fork of the Trinity River. It is treated at the District’s treatment facilities located at 1811 Regal Row. Treated water is then transmitted to the town and the city through a 36″ main in Denton Drive and Mockingbird Lane.

Is our water tested?

The District performs a minimum of 7,150 tests per month on water quality. Parameters regularly tested during and after treatment include water temperature, turbidity, alkalinity, pH, hardness, chlorides, chloramine disinfectant level or residual, and presence or absence of coliform bacteria.

Because we produce water continuously, our plant is staffed 24/7 year-round to ensure sampling is performed at all stages of the water treatment process, as well as throughout the distribution system. Testing is done before treatment, after coagulation and flocculation, after sedimentation, after filtration, and as treated water leaves the plant.

  • Water temperature, tested at start of treatment, affects the reaction efficiency for particle removal and disinfection. 
  • Turbidity is a direct measure of water clarity and reflects the effectiveness of the particle removal processes. 
  • Alkalinity and pH are important factors in the coagulation reaction and pH is important during disinfection, therefore these values are measured throughout the process.
  • Water hardness is measured to assess the lime softening process.
  • Chlorides are monitored in raw and treated water to forewarn of any upstream contamination and allow for appropriate treatment adjustment.
  • Disinfectant residuals are monitored to insure adequate levels are maintained after disinfection, after filtration, and as treated water leaves the plant and out in the distribution system.
  • Presence of coliform bacteria in water supplies indicates possible microbiological contamination. For this reason, bacteriological tests are performed on water before, during, and after treatments, and at designated locations in the distribution system.
  • Monitoring and testing for organic, metallic, and radioactive contaminants are performed by the TCEQ (Texas Commission on Environmental Quality) on water entering the distribution system.

Of the 97 tests required by the EPA, all constituents detected are well below regulatory limits.

Drought
Information

Park Cities’ Drought Contingency Plan
Triggers:

• Demand exceeds 90% of capacity for 3 straight days
• Supply becomes contaminated
• Failure or damage of major system components
• Level in Grapevine Lake reaches 527.0 feet (8 feet low)

Actions: (Goal – 2% Reduction)

• Reduction in municipal operations water usage
•  Voluntary water reductions by public and commercial users
• Increase public education on ways to reduce water usage
• Intensify efforts on leak detection and repair
• Initiate voluntary landscape irrigation schedules

Water
Conservation
Tips

  • Reduce your outdoor watering to once every 5 days. This encourages deeper, more drought-tolerant roots. And remember if it rains more than 1 inch, wait at least 5 days to water.
    If your sprinkler sprays a fine mist, you’re losing a lot of water to evaporation. Try a different sprinkler head or better yet choose a drip system.

  • Mulch, mulch, mulch! This simple step captures and retains soil moisture beautifully so that your landscape can withstand the Texas heat.

  • Cover pools and spas when not in use to lessen evaporation. A typical Texas summer can cause a water loss of almost 1,800 gallons a month.

  • Most showers pour out between 5 and 10 gallons per minute. Time yourself when you're under the spray. And choose a low-flow showerhead that saves about one-half of the amount of water you’re currently using while still providing a refreshing, cleansing shower.

  • Using about 12 gallons per run, automatic dishwashers claim the most water in the kitchen so make sure they’re full before you turn them on. Same holds true for washing machines which use more than 40 gallons a load.

  • One little leak can add up to 15-20 gallons of wasted water a day. Check all faucets at least once or twice a year.